Shandong CaiFu Chemical Co., Ltd
/
/
The first public announcement of the environmental impact assessment of the 60,000 tons/year magnesium nitrate hexahydrate project

news center

Check category

The first public announcement of the environmental impact assessment of the 60,000 tons/year magnesium nitrate hexahydrate project

  • Categories:News Center
  • Author:
  • Origin:
  • Time of issue:2019-07-26 11:28
  • Views:

(Summary description)Shandong Fortune Chemical Co., Ltd. 60 thousand tons/year magnesium nitrate hexahydrate project The first announcement of public participation in environmental impact assessment

The first public announcement of the environmental impact assessment of the 60,000 tons/year magnesium nitrate hexahydrate project

(Summary description)Shandong Fortune Chemical Co., Ltd. 60 thousand tons/year magnesium nitrate hexahydrate project

The first announcement of public participation in environmental impact assessment

  • Categories:News Center
  • Author:
  • Origin:
  • Time of issue:2019-07-26 11:28
  • Views:
Information

Shandong Fortune Chemical Co., Ltd. 60 thousand tons/year magnesium nitrate hexahydrate project

The first announcement of public participation in environmental impact assessment

1. Name and summary of construction project

Project name: 60,000 tons/year magnesium nitrate hexahydrate project

Construction unit: Shandong Fortune Chemical Co., Ltd.

Shandong Fortune Chemical Co., Ltd. was established on November 22, 2006 with a registered capital of 20 million yuan. It is a wholly-owned subsidiary of Shandong Huayang Deere Chemical Co., Ltd., located in Ningyang Chemical Industrial Park (formerly Ningyang County Biochemical Base) , Covers an area of ​​100 acres. The company plans to invest 2.6 million yuan to build a 30,000 tons/year hexahydrate magnesium nitrate project in the existing plant area, mainly using the original 30,000 tons/year calcium ammonium nitrate and 20,000 tons/year calcium nitrate workshops and some equipment, and Some equipment is newly installed. After the project is completed, it will produce 60,000 tons of magnesium nitrate hexahydrate per year. The project does not add new labor quotas, and the production adopts a three-shift work system, with 8 hours of work per shift and 300 days of work per year.

2. Name and contact information of the construction unit

Construction unit: Shandong Fortune Chemical Co., Ltd.

Contact address: Ningyang Chemical Industry Park (formerly Ningyang County Biochemical Base)

Contact: Zhu Lisheng

Contact number: 15169817658

Email: 15169817658@163.com

3. The name and contact information of the environmental impact assessment agency undertaking the assessment

Evaluation unit: Shandong Rudi Environmental Technology Co., Ltd.

Contact: Wang Gong

Contact number: 18953801660

Email: china_eia_report@163.com

4. Web link to the public comment form

http://www.mee.gov.cn/xxgk2018/xxgk/xxgk01/201810/t20181024_665329.html

5. Working procedures and main work content of environmental impact assessment

The working procedures include: (1) Preparation stage: study relevant documents, conduct environmental status survey, screen key evaluation items, and determine the evaluation work level. (2) Formal work stage: further engineering analysis and status investigation and monitoring, and environmental impact prediction and evaluation. (3) The report preparation stage: summarize information and data, put forward environmental protection measures and suggestions, draw conclusions, and complete report preparation.

The main work content includes (1) Engineering analysis: introducing the project overview, the environmental overview of the project construction site and environmental protection goals, analyzing the impact and evaluation of the various stages of the project implementation process on the environment at different times, and putting forward environmental protection suggestions and measures . (2) Compliance analysis with related plans: analyze the opinions of governments, planning and environmental protection departments at all levels where the project is located. (3) Current environmental quality: In accordance with the requirements of national laws and regulations, monitor and evaluate the current environmental quality of the project construction area. (4) Environmental impact prediction: Predict the main environmental factors of the construction project, and evaluate the prediction results. (5) Ecological protection measures: Propose reasonable and feasible measures and countermeasures to control pollution and protect the ecological environment, and to control and reduce or reduce the negative impact caused by project construction to the greatest extent. (6) Public participation: adopt public participation methods such as environmental information announcements, survey public opinions, etc., conduct public participation, reflect the feedback of public participation in the environmental assessment, and give a conclusion on whether to adopt or not. (7) Put forward environmental impact assessment conclusions: put forward environmental impact assessment conclusions on the basis of the aforementioned work.

Sixth, the main issues for public opinions

①Understanding of the project; ②Whether the project will increase the pollution to the local environment;

③The attitude of adopting mitigation measures to this project; ④The effect of the construction of this project on local economic development;

⑤ Whether to support this project; ⑥ Other opinions or suggestions on environmental protection of this project.

Seven, the main way the public put forward opinions

(1) Within ten days from the date of the announcement, the construction unit or the entrusted environmental impact report preparation unit shall provide the public with relevant information inquiry and reference services.

(2) If the public has environmental protection opinions on construction projects, they can express their opinions to the construction unit or the environmental impact report preparation unit by telephone, letter or E-mail within ten days from the date of this announcement, or they can express their opinions The opinions of the Party shall be formed into written text and sent to the local environmental protection authority.

Attachment 1: Shandong Fortune Chemical Co., Ltd. 30,000 tons of annual magnesium nitrate hexahydrate project environmental impact assessment public participation in the first public announcement

Attachment 2: Statistical Table of Environmental Information Disclosure Work of Key Pollutant Discharge Units in Ningyang County in 2019

Scan the QR code to read on your phone

Shandong CaiFu Chemical Co., Ltd

address:

No. 07, Geshi Road, Chemical Industry Park, Ningyang Economic Development Zone, Ningyang County, Tai'an City, Shandong Province.

Corporate Philosophy

The company adheres to the management philosophy of "doing things with your heart and being a man by duty", and takes "becoming high-end fertilizers affordable by the common people" as its corporate mission. Shandong Fortune Chemical Co., Ltd. will continue to forge ahead and provide global customers with high-quality products and services. Create a better future!

Online message

Username used for comment:
客户留言
Description:
验证码