Shandong CaiFu Chemical Co., Ltd
/
/
Announcement of the environmental assessment of the project with an annual output of 50,000 tons of high potassium nitro-based water-soluble fertilizer

news center

Check category

Announcement of the environmental assessment of the project with an annual output of 50,000 tons of high potassium nitro-based water-soluble fertilizer

  • Categories:News Center
  • Author:
  • Origin:
  • Time of issue:2019-08-26 15:12
  • Views:

(Summary description) Shandong Fortune Chemical Co., Ltd. was established on November 22, 2006 with a registered capital of 20 million yuan. It is a wholly-owned subsidiary of Shandong Huayang Deere Chemical Co., Ltd., located in Ningyang Chemical The industrial park (formerly Ningyang County Biochemical Base) covers an area of ​​100 mu.

Announcement of the environmental assessment of the project with an annual output of 50,000 tons of high potassium nitro-based water-soluble fertilizer

(Summary description) Shandong Fortune Chemical Co., Ltd. was established on November 22, 2006 with a registered capital of 20 million yuan. It is a wholly-owned subsidiary of Shandong Huayang Deere Chemical Co., Ltd., located in Ningyang Chemical The industrial park (formerly Ningyang County Biochemical Base) covers an area of ​​100 mu.

  • Categories:News Center
  • Author:
  • Origin:
  • Time of issue:2019-08-26 15:12
  • Views:
Information

Shandong Fortune Chemical Co., Ltd. annual output of 50,000 tons of high potassium nitro-based water-soluble fertilizer project

The first announcement of public participation in environmental impact assessment

        1. Construction project name and summary

        Project name: Project with an annual output of 50,000 tons of high potassium nitro-based water-soluble fertilizer

        Construction unit: Shandong Fortune Chemical Co., Ltd.

        Shandong Fortune Chemical Co., Ltd. was established on November 22, 2006 with a registered capital of 20 million yuan. It is a wholly-owned subsidiary of Shandong Huayang Deere Chemical Co., Ltd., located in Ningyang Chemical The industrial park (formerly Ningyang County Biochemical Base) covers an area of ​​100 mu. The company intends to invest 22.73 million yuan to build a new production line with an annual output of 50,000 tons of high-potassium nitro-based water-soluble fertilizer. The main equipment includes reactor, filter press, fluidized bed, tail gas tower, centrifuge, crystallization tank, remelting kettle, Automatic baler, storage tank, etc. The project covers an area of ​​10044.8m2, with a construction area of ​​7104.8m2. The project has an additional labor force of 75. The production adopts a three-shift two-operation work system, with 12 hours of work per shift and 300 days of work per year.

        2. Name and contact information of the construction unit

        Construction unit: Shandong Fortune Chemical Co., Ltd.

        Contact address: Ningyang Chemical Industrial Park (formerly Ningyang County Biochemical Base)

        Contact: Zhu Lisheng

        Tel: 15169817658

        Email: 15169817658@163.com

        3. The name and contact information of the environmental impact assessment agency undertaking the assessment work

        Evaluation unit: Shandong Rudi Environmental Technology Co., Ltd.

        Contact: Wang Gong

        Tel: 18953801660

        Email: china_eia_report@163.com

        Fourth, the network link of the public comment form

        http://www.mee.gov.cn/xxgk2018/xxgk/xxgk01/201810/t20181024_665329.html

        V. Working procedures and main work content of environmental impact assessment

        The working procedures include: (1) Preparation stage: research related documents, conduct environmental status investigation, screen key evaluation items, and determine the evaluation work level. (2) Formal work stage: further engineering analysis and status investigation and monitoring, and environmental impact prediction and evaluation. (3) The report preparation stage: summarize information and data, put forward environmental protection measures and suggestions, draw conclusions, and complete report preparation.

        The main work content includes (1) Engineering analysis: introduce the project overview, the environmental overview of the project construction site and environmental protection goals, and analyze the impact of each stage of the project implementation process on the environment at different times And its evaluation, and put forward environmental protection suggestions and measures. (2) Compliance analysis with related plans: analyze the opinions of governments, planning and environmental protection departments at all levels where the project is located. (3) Current environmental quality: In accordance with the requirements of national laws and regulations, monitor and evaluate the current environmental quality of the project construction area. (4) Environmental impact prediction: Predict the main environmental factors of the construction project, and evaluate the prediction results. (5) Ecological protection measures: Propose reasonable and feasible measures and countermeasures to control pollution and protect the ecological environment, and to control and reduce or reduce the negative impact caused by project construction to the greatest extent. (6) Public participation: adopt public participation methods such as environmental information announcements, survey public opinions, etc., conduct public participation, reflect the feedback of public participation in the environmental assessment, and give a conclusion on whether to adopt or not. (7) Put forward environmental impact assessment conclusions: put forward environmental impact assessment conclusions on the basis of the aforementioned work.

        Sixth, the main matters for soliciting public opinions

        ①Knowledge of this project; ②Whether this project will increase pollution to the local environment;

        ③The attitude of taking mitigation measures to this project; ④The effect of the construction of this project on local economic development;

        ⑤Do you support this project;          ⑥Other comments or suggestions on environmental protection of this project.

        Seven, the main way the public put forward comments

        (1) Within ten days from the date of the announcement, the construction unit or the entrusted environmental impact report preparation unit shall provide the public with relevant information inquiries and reference services.

        (2) If the public has opinions on environmental protection of the construction project, within ten days from the date of this announcement, they can report to the construction unit or environmental impact by telephone, letter or E-Mail The preparation unit of the book may express its opinions, and may also send its opinions in written form to the local environmental protection authority.

Scan the QR code to read on your phone

Shandong CaiFu Chemical Co., Ltd

address:

No. 07, Geshi Road, Chemical Industry Park, Ningyang Economic Development Zone, Ningyang County, Tai'an City, Shandong Province.

Corporate Philosophy

The company adheres to the management philosophy of "doing things with your heart and being a man by duty", and takes "becoming high-end fertilizers affordable by the common people" as its corporate mission. Shandong Fortune Chemical Co., Ltd. will continue to forge ahead and provide global customers with high-quality products and services. Create a better future!

Online message

Username used for comment:
客户留言
Description:
验证码